The project includes the construction of 150 single residential and 4 multi units dwellings.
-
Scope
- Environmental protection measures
- Temporary traffic management
- Clearing and grubbing
- Earthworks including cutting and filling of site materials and importation and disposal of materials as required
- Stormwater and subsoil drainage
- Sewer and water reticulation
- Gas
- Electrical and communications conduit
- Temporary and permanent pavements
- Street lighting
- Traffic signals
- Landscaping
- Quality assurance testing and reporting.
Special Features
Perform 144,000m3 of cut to fill earthworks, supply & installation of 1172m of 1200mm stormwater pipes with 9 large twin chambered manholes and the supply & installation of 16 km of various hydraulic services.