Brief

The project includes the construction of 150 single residential and 4 multi units dwellings.

    Scope

  • Environmental protection measures
  • Temporary traffic management
  • Clearing and grubbing
  • Earthworks including cutting and filling of site materials and importation and disposal of materials as required
  • Stormwater and subsoil drainage
  • Sewer and water reticulation
  • Gas
  • Electrical and communications conduit
  • Temporary and permanent pavements
  • Street lighting
  • Traffic signals
  • Landscaping
  • Quality assurance testing and reporting.

Special Features

Perform 144,000m3 of cut to fill earthworks, supply & installation of 1172m of 1200mm stormwater pipes with 9 large twin chambered manholes and the supply & installation of 16 km of various hydraulic services.

All works associated with this project relate to categories applied for in our prequalification application.